- seacocks - all were removed, inspected cleaned, re-installed
- mast - removed, and all cables and bulbs were checked and replaced as necessary
- standing rigging - ALL standing rigging was replaced (ouch)
- new masthead light and wind indicator
- batteries - all batteries are serviced, and one house battery is replaced
- zinc - replace zinc on prop
- nav lights - bow and stern lights were replaced
- brightwork - all teak was stripped and 4 coats of cettol applied
- hull - repair damage and paint port side
- bottom paint (Interlux xxx)
- VHF - new radio with cockpit mic, antenna replaced
- bobstay - bobstay and backing plate are replaced
- anchor locker - painted and removed rotten locker floor boards, leaks repaired
- propane locker - reposition and secure locker
- battery charger - install switch on panel
- deck hardware and fittings - remove and rebed all
- genoa furling - install new harken system
- cabin heater - build fuel tank and install
- stuffing box - inspected
- charts - charts for BC coast trip obtained
- lights - repaired interior lights and replaced bulbs as needed
- jack lines - sew jacklines and tethers
- sail ties - sewed many ties
- companionway steps - repaired and reinforced
- genoa - repaired
- bilge pump - fix wiring
- blocks - new mainsheet and traveler blocks, and snatch block
- dodger - new, using existing frame
- alarm - install engine oil pressure alarm
- ignition - install ignition alarm silencer
- outboard - purchase small outboard for dinghy
- anchor rode - whipping to indicate anchor depth
Friday, May 16, 2008
Spring Tune Up
A few chores that we accomplished during our spring haul-out were:
Subscribe to:
Posts (Atom)